
Catalog image · confirm final geometry against your approved drawing.
Oxygen mask plastic medical device
Instrument tooling DFM and CMM verification for oxygen mask plastic medical device. Specify polymer grade, DIN 16742 tolerances, and FAI checks via RFQ.
Request a QuoteSubmit your 3D STEP/IGES and 2D PDF drawing to confirm resin grade, cavity layout, steel selection, tolerances, and 35 to 45 day T1 build timing.
Engineering Guidance for Oxygen mask plastic medical device: Parameters to Confirm on Your Drawing
Reference #087 (Oxygen mask plastic medical device) falls under laboratory & medical instrument tooling within our Medical Devices catalog. Every tooling build and molded part program begins with a drawing-based DFM check covering nominal wall transitions, gate location, resin shrinkage, surface texture, and Croma 3D CMM First Article Inspection (FAI).
| Engineering Parameter | Recommended Scope & RFQ Input |
|---|---|
| Primary Process Scope | Laboratory & Medical Instrument Tooling — confirm whether scope covers export mold only, molded parts, or turnkey tooling + production. |
| Typical Resin / Alloy Scope | Customer-specified medical or laboratory grades of PC, PP, COC/COP, ABS, or TPE confirmed against intended-use compliance. Confirm exact resin manufacturer, filler %, flame rating, and color code. |
| Recommended Mold Steel | Electro-Slag Remelted S136 / DIN 1.2083 stainless steel (48 to 52 HRC) for rust prevention and high-purity polish |
| Surface Finish & Draft | SPI A1 to A2 optical finish on fluid paths and viewing windows; burr-free shutoffs and clean witness lines |
| Press & Standard Interface | 80T to 190T controlled presses for T1 validation trials, dimensional FAI qualification, and export-ready tooling transfer. Specify DME, HASCO, or local press platen & sprue standards. |
| Tolerance & CMM FAI Focus | Croma 3D CMM dimensional FAI, coaxial bore/luer alignment, parting-line step limits, and resin lot documentation |
| CAD & 2D Drawing Inputs | Submit 3D STEP/IGES/X_T files and ballooned 2D PDF drawings for oxygen mask plastic medical device; mutual NDA available before file transfer. |
| Lead Time & Delivery Terms | Standard tooling build 35 to 45 days (20 to 35 days for prototype/bridge tools); EXW Shenzhen, FOB, CIF, or DDP terms agreed per RFQ. |
Guidance above outlines typical tooling and molding parameters for medical devices parts and does not represent confidential customer specs of the reference photo. Exchange proprietary CAD only after signing a mutual NDA.
Key Engineering Checkpoints for Oxygen mask plastic medical device
Tool Steel & Cavity Machining Strategy
Electro-Slag Remelted S136 / DIN 1.2083 stainless steel (48 to 52 HRC) for rust prevention and high-purity polish. Cavity and core details are finished via Makino CNC, Sodick wire-cut EDM, and Charmilles mirror EDM.
Dimensional Metrology & Press Validation
Croma 3D CMM dimensional FAI, coaxial bore/luer alignment, parting-line step limits, and resin lot documentation. Trial runs and pre-production batches execute on 80T to 190T controlled presses for T1 validation trials, dimensional FAI qualification, and export-ready tooling transfer.



