
Catalog image · confirm final geometry against your approved drawing.
Lab device
Instrument tooling DFM and CMM verification for lab device. Specify polymer grade, DIN 16742 tolerances, and FAI checks via RFQ.
Request a QuoteSubmit your 3D STEP/IGES and 2D PDF drawing to confirm resin grade, cavity layout, steel selection, tolerances, and 35 to 45 day T1 build timing.
Engineering Guidance for Lab device: Parameters to Confirm on Your Drawing
Reference #033 (Lab device) falls under laboratory & medical instrument tooling within our Medical Devices catalog. Every tooling build and molded part program begins with a drawing-based DFM check covering nominal wall transitions, gate location, resin shrinkage, surface texture, and Croma 3D CMM First Article Inspection (FAI).
| Engineering Parameter | Recommended Scope & RFQ Input |
|---|---|
| Primary Process Scope | Laboratory & Medical Instrument Tooling — confirm whether scope covers export mold only, molded parts, or turnkey tooling + production. |
| Typical Resin / Alloy Scope | Customer-specified medical or laboratory grades of PC, PP, COC/COP, ABS, or TPE confirmed against intended-use compliance. Confirm exact resin manufacturer, filler %, flame rating, and color code. |
| Recommended Mold Steel | Electro-Slag Remelted S136 / DIN 1.2083 stainless steel (48 to 52 HRC) for rust prevention and high-purity polish |
| Surface Finish & Draft | SPI A1 to A2 optical finish on fluid paths and viewing windows; burr-free shutoffs and clean witness lines |
| Press & Standard Interface | 80T to 190T controlled presses for T1 validation trials, dimensional FAI qualification, and export-ready tooling transfer. Specify DME, HASCO, or local press platen & sprue standards. |
| Tolerance & CMM FAI Focus | Croma 3D CMM dimensional FAI, coaxial bore/luer alignment, parting-line step limits, and resin lot documentation |
| CAD & 2D Drawing Inputs | Submit 3D STEP/IGES/X_T files and ballooned 2D PDF drawings for lab device; mutual NDA available before file transfer. |
| Lead Time & Delivery Terms | Standard tooling build 35 to 45 days (20 to 35 days for prototype/bridge tools); EXW Shenzhen, FOB, CIF, or DDP terms agreed per RFQ. |
Guidance above outlines typical tooling and molding parameters for medical devices parts and does not represent confidential customer specs of the reference photo. Exchange proprietary CAD only after signing a mutual NDA.
Key Engineering Checkpoints for Lab device
Tool Steel & Cavity Machining Strategy
Electro-Slag Remelted S136 / DIN 1.2083 stainless steel (48 to 52 HRC) for rust prevention and high-purity polish. Cavity and core details are finished via Makino CNC, Sodick wire-cut EDM, and Charmilles mirror EDM.
Dimensional Metrology & Press Validation
Croma 3D CMM dimensional FAI, coaxial bore/luer alignment, parting-line step limits, and resin lot documentation. Trial runs and pre-production batches execute on 80T to 190T controlled presses for T1 validation trials, dimensional FAI qualification, and export-ready tooling transfer.



