Plastic packing products: Packaging & Caps catalog reference by Nodinson, Shenzhen

Catalog image · confirm final geometry against your approved drawing.

Plastic packing products

Multi-cavity tooling and cycle optimization for plastic packing products. Review closure fit, snap geometry, gating, and export RFQ lead time.

Request a Quote

Submit your 3D STEP/IGES and 2D PDF drawing to confirm resin grade, cavity layout, steel selection, tolerances, and 35 to 45 day T1 build timing.

Engineering Guidance for Plastic packing products: Parameters to Confirm on Your Drawing

Reference #053 (Plastic packing products) falls under multi-cavity closure & packaging tooling within our Packaging & Caps catalog. Every tooling build and molded part program begins with a drawing-based DFM check covering nominal wall transitions, gate location, resin shrinkage, surface texture, and Croma 3D CMM First Article Inspection (FAI).

Drawing-Confirmed Specification Guidance for Plastic packing products
Engineering ParameterRecommended Scope & RFQ Input
Primary Process ScopeMulti-Cavity Closure & Packaging Tooling — confirm whether scope covers export mold only, molded parts, or turnkey tooling + production.
Typical Resin / Alloy ScopePP, HDPE, PETG, SAN, PMMA, and crystal PS specified for stress-crack resistance, living-hinge flex, or clarity. Confirm exact resin manufacturer, filler %, flame rating, and color code.
Recommended Mold SteelCorrosion-resistant S136 ESR (48 to 52 HRC) for high-cycle cosmetic caps, hinged lids, and clear rigid containers
Surface Finish & DraftSPI A1 to A2 mirror polish for transparent boxes and luxury caps; low-drag core polish for rapid ejection
Press & Standard Interface80T to 250T presses running balanced multi-cavity hot runners with valve-gate or pinpoint-gate clean breakoff. Specify DME, HASCO, or local press platen & sprue standards.
Tolerance & CMM FAI FocusUniform wall concentricity, living-hinge melt-flow alignment, cap snap torque, and shot-to-shot weight repeatability
CAD & 2D Drawing InputsSubmit 3D STEP/IGES/X_T files and ballooned 2D PDF drawings for plastic packing products; mutual NDA available before file transfer.
Lead Time & Delivery TermsStandard tooling build 35 to 45 days (20 to 35 days for prototype/bridge tools); EXW Shenzhen, FOB, CIF, or DDP terms agreed per RFQ.

Guidance above outlines typical tooling and molding parameters for packaging & caps parts and does not represent confidential customer specs of the reference photo. Exchange proprietary CAD only after signing a mutual NDA.

Key Engineering Checkpoints for Plastic packing products

Tool Steel & Cavity Machining Strategy

Corrosion-resistant S136 ESR (48 to 52 HRC) for high-cycle cosmetic caps, hinged lids, and clear rigid containers. Cavity and core details are finished via Makino CNC, Sodick wire-cut EDM, and Charmilles mirror EDM.

Dimensional Metrology & Press Validation

Uniform wall concentricity, living-hinge melt-flow alignment, cap snap torque, and shot-to-shot weight repeatability. Trial runs and pre-production batches execute on 80T to 250T presses running balanced multi-cavity hot runners with valve-gate or pinpoint-gate clean breakoff.

Back to packaging & caps