
Catalog image · confirm final geometry against your approved drawing.
Plastic packing products
Multi-cavity tooling and cycle optimization for plastic packing products. Review closure fit, snap geometry, gating, and export RFQ lead time.
Request a QuoteSubmit your 3D STEP/IGES and 2D PDF drawing to confirm resin grade, cavity layout, steel selection, tolerances, and 35 to 45 day T1 build timing.
Engineering Guidance for Plastic packing products: Parameters to Confirm on Your Drawing
Reference #053 (Plastic packing products) falls under multi-cavity closure & packaging tooling within our Packaging & Caps catalog. Every tooling build and molded part program begins with a drawing-based DFM check covering nominal wall transitions, gate location, resin shrinkage, surface texture, and Croma 3D CMM First Article Inspection (FAI).
| Engineering Parameter | Recommended Scope & RFQ Input |
|---|---|
| Primary Process Scope | Multi-Cavity Closure & Packaging Tooling — confirm whether scope covers export mold only, molded parts, or turnkey tooling + production. |
| Typical Resin / Alloy Scope | PP, HDPE, PETG, SAN, PMMA, and crystal PS specified for stress-crack resistance, living-hinge flex, or clarity. Confirm exact resin manufacturer, filler %, flame rating, and color code. |
| Recommended Mold Steel | Corrosion-resistant S136 ESR (48 to 52 HRC) for high-cycle cosmetic caps, hinged lids, and clear rigid containers |
| Surface Finish & Draft | SPI A1 to A2 mirror polish for transparent boxes and luxury caps; low-drag core polish for rapid ejection |
| Press & Standard Interface | 80T to 250T presses running balanced multi-cavity hot runners with valve-gate or pinpoint-gate clean breakoff. Specify DME, HASCO, or local press platen & sprue standards. |
| Tolerance & CMM FAI Focus | Uniform wall concentricity, living-hinge melt-flow alignment, cap snap torque, and shot-to-shot weight repeatability |
| CAD & 2D Drawing Inputs | Submit 3D STEP/IGES/X_T files and ballooned 2D PDF drawings for plastic packing products; mutual NDA available before file transfer. |
| Lead Time & Delivery Terms | Standard tooling build 35 to 45 days (20 to 35 days for prototype/bridge tools); EXW Shenzhen, FOB, CIF, or DDP terms agreed per RFQ. |
Guidance above outlines typical tooling and molding parameters for packaging & caps parts and does not represent confidential customer specs of the reference photo. Exchange proprietary CAD only after signing a mutual NDA.
Key Engineering Checkpoints for Plastic packing products
Tool Steel & Cavity Machining Strategy
Corrosion-resistant S136 ESR (48 to 52 HRC) for high-cycle cosmetic caps, hinged lids, and clear rigid containers. Cavity and core details are finished via Makino CNC, Sodick wire-cut EDM, and Charmilles mirror EDM.
Dimensional Metrology & Press Validation
Uniform wall concentricity, living-hinge melt-flow alignment, cap snap torque, and shot-to-shot weight repeatability. Trial runs and pre-production batches execute on 80T to 250T presses running balanced multi-cavity hot runners with valve-gate or pinpoint-gate clean breakoff.



