
Catalog image · confirm final geometry against your approved drawing.
Motorcycle plastic components
Export tooling DFM and 80T–400T molding for motorcycle plastic components. Confirm filled resin shrinkage, CMM datums, and FAI scope via RFQ.
Request a QuoteSubmit your 3D STEP/IGES and 2D PDF drawing to confirm resin grade, cavity layout, steel selection, tolerances, and 35 to 45 day T1 build timing.
Engineering Guidance for Motorcycle plastic components: Parameters to Confirm on Your Drawing
Reference #037 (Motorcycle plastic components) falls under export automotive component & trim tooling within our Automotive Tooling catalog. Every tooling build and molded part program begins with a drawing-based DFM check covering nominal wall transitions, gate location, resin shrinkage, surface texture, and Croma 3D CMM First Article Inspection (FAI).
| Engineering Parameter | Recommended Scope & RFQ Input |
|---|---|
| Primary Process Scope | Export Automotive Component & Trim Tooling — confirm whether scope covers export mold only, molded parts, or turnkey tooling + production. |
| Typical Resin / Alloy Scope | ABS, PC/ABS, ASA, PA66-GF30, PBT, and UV-stabilized polycarbonate matched to cabin heat and exterior weathering. Confirm exact resin manufacturer, filler %, flame rating, and color code. |
| Recommended Mold Steel | Hardened 718H (33 to 37 HRC) for large interior trim; H13 or S136 ESR for abrasive GF30 and clear lighting lenses |
| Surface Finish & Draft | Controlled VDI 24 to 33 grain matching for interior bezels; SPI A1 diamond polish on clear lens optics |
| Press & Standard Interface | 160T to 400T molding presses configured for DME or HASCO export standards, multi-zone hot runners, and stable cycles. Specify DME, HASCO, or local press platen & sprue standards. |
| Tolerance & CMM FAI Focus | Datum-referenced Croma 3D CMM FAI and CPK checks across mounting clips, flush trim gaps, and thermal warpage |
| CAD & 2D Drawing Inputs | Submit 3D STEP/IGES/X_T files and ballooned 2D PDF drawings for motorcycle plastic components; mutual NDA available before file transfer. |
| Lead Time & Delivery Terms | Standard tooling build 35 to 45 days (20 to 35 days for prototype/bridge tools); EXW Shenzhen, FOB, CIF, or DDP terms agreed per RFQ. |
Guidance above outlines typical tooling and molding parameters for automotive tooling parts and does not represent confidential customer specs of the reference photo. Exchange proprietary CAD only after signing a mutual NDA.
Key Engineering Checkpoints for Motorcycle plastic components
Tool Steel & Cavity Machining Strategy
Hardened 718H (33 to 37 HRC) for large interior trim; H13 or S136 ESR for abrasive GF30 and clear lighting lenses. Cavity and core details are finished via Makino CNC, Sodick wire-cut EDM, and Charmilles mirror EDM.
Dimensional Metrology & Press Validation
Datum-referenced Croma 3D CMM FAI and CPK checks across mounting clips, flush trim gaps, and thermal warpage. Trial runs and pre-production batches execute on 160T to 400T molding presses configured for DME or HASCO export standards, multi-zone hot runners, and stable cycles.



