
Catalog image · confirm final geometry against your approved drawing.
Double injection mold for power tool parts
Two-shot and substrate-bonding tooling DFM for double injection mold for power tool parts. Review resin bonding & 80T–400T molding.
Request a QuoteSubmit your 3D STEP/IGES and 2D PDF drawing to confirm resin grade, cavity layout, steel selection, tolerances, and 35 to 45 day T1 build timing.
Engineering Guidance for Double injection mold for power tool parts: Parameters to Confirm on Your Drawing
Reference #014 (Double injection mold for power tool parts) illustrates custom two-shot (2k) & tpe/tpu overmolding built in-house on Makino CNC, Sodick slow wire-cut, and Charmilles mirror EDM equipment. Steel selection (Hardened S136 or H13 (48 to 52 HRC) on shut-off land edges to resist wear during repeated second-shot clamping), runner architecture, DME/HASCO platen compatibility, and T1 sampling on our 80T–400T presses are defined from your approved drawing.
| Engineering Parameter | Recommended Scope & RFQ Input |
|---|---|
| Primary Process Scope | Two-Shot (2K) & TPE/TPU Overmolding — confirm whether scope covers export mold only, molded parts, or turnkey tooling + production. |
| Typical Resin / Alloy Scope | Rigid PC, ABS, or PA66 substrates chemically paired with compatible TPE, TPU, or soft-touch elastomer overmolds. Confirm exact resin manufacturer, filler %, flame rating, and color code. |
| Recommended Mold Steel | Hardened S136 or H13 (48 to 52 HRC) on shut-off land edges to resist wear during repeated second-shot clamping |
| Surface Finish & Draft | Fine VDI 21 to 27 grip texture on elastomer skins with clean parting-line transitions along rigid substrates |
| Press & Standard Interface | Rotary two-shot or pick-and-place transfer molding (120T to 380T) with positive steel-to-steel shut-off seals. Specify DME, HASCO, or local press platen & sprue standards. |
| Tolerance & CMM FAI Focus | Substrate-to-cavity seal crush (0.05 to 0.15 mm interference) to eliminate soft elastomer bleed and flash |
| CAD & 2D Drawing Inputs | Submit 3D STEP/IGES/X_T files and ballooned 2D PDF drawings for double injection mold for power tool parts; mutual NDA available before file transfer. |
| Lead Time & Delivery Terms | Standard tooling build 35 to 45 days (20 to 35 days for prototype/bridge tools); EXW Shenzhen, FOB, CIF, or DDP terms agreed per RFQ. |
Guidance above outlines typical tooling and molding parameters for 2k & overmolding parts and does not represent confidential customer specs of the reference photo. Exchange proprietary CAD only after signing a mutual NDA.
Key Engineering Checkpoints for Double injection mold for power tool parts
Substrate Bonding & Elastomer Shut-Off Integrity
Multi-material execution for double injection mold for power tool parts combines chemically compatible substrate/elastomer resins with mechanical interlock ribs and hardened steel shut-off lands to block soft-shot flash.
Tool Steel & Cavity Machining Strategy
Hardened S136 or H13 (48 to 52 HRC) on shut-off land edges to resist wear during repeated second-shot clamping. Cavity and core details are finished via Makino CNC, Sodick wire-cut EDM, and Charmilles mirror EDM.
Dimensional Metrology & Press Validation
Substrate-to-cavity seal crush (0.05 to 0.15 mm interference) to eliminate soft elastomer bleed and flash. Trial runs and pre-production batches execute on rotary two-shot or pick-and-place transfer molding (120T to 380T) with positive steel-to-steel shut-off seals.



